Account
Mining Science and Technology (Russia)

Mining Science and Technology (Russia)

Journal Mining Science and Technology (Russia) 🌍 Advancing mining research worldwide Scimago Journal & Country Rank (SJR) - Q1 🔬 Scopus Q2 | Open-access peer-reviewed 📊 Indexed: CAS/GeoRef/DOAJ/EngVillage 👥 3.1К+ researchers | mst.misis.ru

Username
@minscitech
Subscribers3,152
Avg views per post, 7d329−81.6% vs prev 7d
ERR10.44%last 7 days

Average views per post by day

By publication day

Show as table
DateAvg views per post
Nov 3, 20267,360
Nov 6, 2026583
Nov 10, 20261,244
Nov 11, 2026460
Nov 13, 20263,493
Nov 19, 20262,436
Nov 20, 2026480
Nov 24, 2026337
Nov 25, 2026313

Most viewed this month

  1. 01
    Views7.36K
    Forwards—
    Reactions7
    Comments—
  2. 02

    ❓ How to automate the design of power supply systems for mining enterprises? The design of power supply systems (PSS) for mining and processing facilities must meet specific requirements, including reliability, safety, cost efficiency, and flexibility. In practice, the process involves repeated manual data transfer between Excel, BIM models, and calculation software, which increases labor intensity and the risk of errors. Researchers have developed a digital software (DS) solution to automate this process. 🔹 How it was investigated: ✔️ Analyzed existing software packages and identified their limitations: fragmented design processes, the need for repeated manual data transfer, dependence on specific equipment manufacturers (Schneider, Siemens, ABB, etc.), the lack of an independent equipment selection module, and weak integration with BIM environments. ✔️ Formalized the methodology for calculating electrical loads according to the regulatory standard RTM 36.18.32.4-92 and implemented short-circuit current calculations with cable cross-section selection according to PUE tables. ✔️ Developed an algorithm and implemented a modular software solution in C#. ✔️ Ensured two-way integration with the BIM platform nanoCAD and the spreadsheet processor Excel. ✔️ Conducted practical testing on the power supply project of the Kumroch gold processing plant (GPP). 🔹 What was obtained: ✔️ Reduced the number of manual data transfer operations by up to 80%. ✔️ Data from the BIM model is imported into the calculation program automatically, without manual intervention. ✔️ The DS calculates electrical loads according to Form F636-92, short-circuit currents, and selects cable cross-sections according to PUE tables and the rated parameters of switching devices. ✔️ Output data is generated in Excel: electrical load calculations (Form F636-92), a cable schedule compliant with GOST 21.613-2014, cable and wire specifications, and a bill of materials and equipment list. ✔️ The software provides data for equipment selection, retaining full freedom of choice for designers and customers regarding the manufacturer. 🔹 Why this is important for mining: ✔️ The end-to-end automated design process minimizes the likelihood of human error and improves calculation accuracy. ✔️ The DS accounts for the specific requirements of electrical systems at mining enterprises, which are characterized by a need for reliability, safety, and flexibility. ✔️ The solution aligns with the digitalization strategy of the energy sector and is intended for implementation in design organizations. ✔️ Future development prospects involve the integration of artificial intelligence for real-time automatic project adjustments and the addition of calculation modules for alternative energy sources. 📖 Read more: Petrov V.L., Burmatova E.K., Pichuev A.V. Integration of digital technologies into the design process of power supply systems for mining enterprises. Mining Science and Technology (Russia). 2025;10(4):393–403. https://doi.org/10.17073/2500-0632-2025-09-461 🔔 Subscribe to the journal's Telegram channel: t.me/MinSciTech #InEnglish #MST #PowerEngineering #Automation #Digitalization #PowerSupplySystems #BIM #Design #MiningIndustry #CSharp #nanoCAD

    Photo
    Views6.56K
    Forwards—
    Reactions9
    Comments—
  3. 03

    🔥 We present one of the articles from the new issue of the journal "Mining Science and Technology" (No. 3, 2026)! The propagation of a blast wave during explosions is one of the most dangerous factors in underground mine workings. For the engineering assessment of its impact, two methods are approved in Russia – R-7 and FNR No. 494 – however, a direct comparison of their accuracy on a unified experimental basis has not been carried out until now. The authors compared the methods in terms of overpressure losses along the length of mine workings and at local resistances (turns, junctions, contractions, and expansions), modeled a real section of the mine in the "Aeroset" analytical complex, and verified the calculations against field measurements during the blasting of oversized rock mass (96 kg of Ammonite 6ZhV, sensor at 217 m from the charge). The result is revealing: the R-7 method predicted a pressure of 1.82 kPa against the measured 1.945 kPa – a deviation of only 6.4 %. By the criterion of the reach distance of the measured pressure, the deviation of R-7 was 5.1 %, whereas for FNR No. 494 the calculated distance was 46 m against the actual 217 m – the discrepancy in distance reached 78.8 %. The reason lies in the different physical models of attenuation. What does this give for practice? A quantitative justification for selecting a calculation approach for assessing hazardous zones: under the considered conditions, R-7 provides a closer match with field measurements. At the same time, it is important to keep in mind that the methods rely on different attenuation models and set the initial conditions differently. 📖 Details are in the article: Kraev O.S., Knyazev N.A., Kormshchikov D.S., Grishin E.L. Comparative analysis of calculation methods for blast wave propagation. Mining Science and Technology (Russia). 2026;11(3):232–243. 🔔 Subscribe to the journal's Telegram channel: t.me/MinSciTech #InRussian #MST #BlastWave #Blasting #IndustrialSafety #MineWorkings #R7Method #FNR494 #TechnologicalSafety

    Photo
    Views4.43K
    Forwards—
    Reactions8
    Comments—
  4. 04

    🔥 We present one of the articles from the new issue of the journal "Mining Science and Technology" (No. 3, 2026)! The main type of loss in X-ray luminescence separation of diamond-bearing kimberlites is weakly and anomalously luminescent diamonds: their spectral-kinetic characteristics do not correspond to the settings of the separators. To reduce these losses, luminophore-containing modifying agents are selectively fixed on the diamond surface, imparting the spectral characteristics of natural diamond to these diamonds. The authors studied how the temperature and pH of the aqueous phase affect the fixation of modifiers on diamonds and kimberlite, and selected regulating agents that reduce the adhesion energy of the organic collector on kimberlite minerals. What is the practical value? Heating the medium to 40 °C, acidifying it to pH = 5.5, and adding OEDP complexonate (200 mg/L) increase diamond recovery in separation by 15–17.5 % and reduce kimberlite yield into the concentrate by 0.15–0.45 %. 📖 Details – in the article: Chanturiya V.A., Morozov V.V., Chanturiya E.L., Samusev A.L., Dvoychenkova G.P. Increasing selectivity of X-ray luminescence separation through the selective fixation of luminophore-containing spectral-kinetic characteristic modifiers on diamonds. Mining Science and Technology (Russia). 2026;11(3):220–231. https://doi.org/10.17073/2500-0632-2026-06-1175 🔔 Subscribe to the journal's Telegram channel: t.me/MinSciTech #InEnglish #MSTRussia #Diamonds #Kimberlites #XRayLuminescenceSeparation #Luminophores #Beneficiation #MiningEngineering

    Photo
    Views1.77K
    Forwards—
    Reactions7
    Comments—

Latest posts

#892Photo

Представляем одну из статей нового выпуска журнала «Горные науки и технологии» (№3, 2026)! Грунтовые воды Москвы – резерв водоснабжения (до 40 м, 30 % пресных ресурсов города), но в них поступает много токсичных веществ, а источники загрязнения трудно установить из-за быстрой фильтрации и распространения примесей в горизонтах. С режимом и составом подземных вод связаны и гидрогеологические риски при строительстве и эксплуатации метрополитена. Авторы разработали подход к идентификации предприятий-загрязнителей по данным наблюдательных скважин и методику количественной оценки гидрогеологических рисков при строительстве тоннелей. Использованы данные мониторинга 2018–2021 гг., полиномиальные тренды, корреляционный анализ и сопоставление с отчётностью предприятий по форме 2-ТП (водхоз). Выявлены ковариации марганца, стронция и бария, а также аммиака и нефтепродуктов. Предприятие-загрязнитель идентифицируется, если его вещества синхронно меняют концентрацию на нескольких скважинах одного горизонта; по данным одной скважины источник не устанавливается. Источники первой группы следует искать среди металлургии и радиоэлектроники, второй – среди химических производств. Быстрый массоперенос может иметь супердиффузионный характер; среди его причин – расклинивающее давление, сорбционный гистерезис и гидрофобный эффект. Что это даёт для практики? Подход опирается на уже собираемые данные (Госэкомониторинг и форма 2-ТП) и позволяет сузить круг возможных загрязнителей, а методика оценки риска – сравнивать котлованный и подземный способы строительства тоннелей уже на стадии проектирования. Наибольшие коэффициенты значимости: изменение гидростатического режима подземных вод (0,18) и инфильтрация грунтовых вод в тоннели (0,13) – для подземного способа, формирование депрессионных воронок (0,15) – для котлованного. Подробности – в статье: Розенталь О.М., Куликова Е.Ю. Анализ состава и свойств грунтовых вод Москвы – основа оценки гидрогеологических рисков. Горные науки и технологии. 2026;11(3):244–255. https://doi.org/10.17073/2500-0632-2026-01-1229 Подписывайтесь на Telegram-канал журнала: t.me/MinSciTech #нарусскомзыке #ГНиТ #ГрунтовыеВоды #Загрязнение #Геостатистика #ИдентификацияЗагрязнителей #Массоперенос #Супердиффузия #ГидрогеологическийРиск #Метрополитен #ОхранаОкружающейСреды

Open in Telegram
Views355−81%vs avg
Forwards—
Reactions7
Comments—
#891Photo

🔥 We present one of the articles from the new issue of the journal "Mining Science and Technology" (No. 3, 2026)! Moscow groundwater is regarded as a reserve source of water supply (occurring at depths up to 40 m and accounting for 30 % of the city's fresh water resources), yet it receives many toxic substances of anthropogenic origin, and pollution sources are difficult to identify because surface water infiltrates rapidly and contaminants spread quickly within aquifers. The regime and composition of groundwater also govern hydrogeological risks in the construction and operation of metro systems. The authors developed an approach for identifying enterprises that pollute groundwater from observation well data, together with a method for quantitative assessment of hydrogeological risks in tunnel construction. They used 2018–2021 monitoring data, polynomial trends, correlation analysis, and comparison with enterprise reports submitted under the 2-TP (vodkhoz) statistical form. Covariations of manganese, strontium and barium, as well as of ammonia and petroleum products, were identified. An enterprise is highly likely to be the pollution source if its substances change concentration synchronously in several wells of the same aquifer; data from a single well do not establish the source. Sources of the first group should be sought among metallurgical and radio-electronic enterprises, and those of the second group among chemical plants. Rapid mass transfer may have a superdiffusive character; its possible causes include disjoining pressure, sorption hysteresis, and the hydrophobic effect. What does this give for practice? The approach relies on already collected data (State Environmental Monitoring and the 2-TP form) and allows narrowing the circle of possible polluters, while the risk assessment method makes it possible to compare cut-and-cover and mined tunnel construction already at the design stage. The highest significance coefficients are: change in the hydrostatic regime of groundwater (0.18) and infiltration of groundwater into tunnels (0.13) – for mined construction; formation of depression cones (0.15) – for cut-and-cover construction. 📖 Details are in the article: Rozental O.M., Kulikova E.Yu. Analysis of the composition and properties of Moscow groundwater. Mining Science and Technology (Russia). 2026;11(3):244–255. https://doi.org/10.17073/2500-0632-2026-01-1229 🔔 Subscribe to the journal's Telegram channel: t.me/MinSciTech #InEnglish #MST #Groundwater #Pollution #Geostatistics #PollutantIdentification #MassTransfer #Superdiffusion #HydrogeologicalRisk #Metro #EnvironmentalProtection

Open in Telegram
Views319−83%vs avg
Forwards—
Reactions5
Comments—
#889Photo

🔥 We present one of the articles from the new issue of the journal "Mining Science and Technology" (No. 3, 2026)! The propagation of a blast wave during explosions is one of the most dangerous factors in underground mine workings. For the engineering assessment of its impact, two methods are approved in Russia – R-7 and FNR No. 494 – however, a direct comparison of their accuracy on a unified experimental basis has not been carried out until now. The authors compared the methods in terms of overpressure losses along the length of mine workings and at local resistances (turns, junctions, contractions, and expansions), modeled a real section of the mine in the "Aeroset" analytical complex, and verified the calculations against field measurements during the blasting of oversized rock mass (96 kg of Ammonite 6ZhV, sensor at 217 m from the charge). The result is revealing: the R-7 method predicted a pressure of 1.82 kPa against the measured 1.945 kPa – a deviation of only 6.4 %. By the criterion of the reach distance of the measured pressure, the deviation of R-7 was 5.1 %, whereas for FNR No. 494 the calculated distance was 46 m against the actual 217 m – the discrepancy in distance reached 78.8 %. The reason lies in the different physical models of attenuation. What does this give for practice? A quantitative justification for selecting a calculation approach for assessing hazardous zones: under the considered conditions, R-7 provides a closer match with field measurements. At the same time, it is important to keep in mind that the methods rely on different attenuation models and set the initial conditions differently. 📖 Details are in the article: Kraev O.S., Knyazev N.A., Kormshchikov D.S., Grishin E.L. Comparative analysis of calculation methods for blast wave propagation. Mining Science and Technology (Russia). 2026;11(3):232–243. 🔔 Subscribe to the journal's Telegram channel: t.me/MinSciTech #InRussian #MST #BlastWave #Blasting #IndustrialSafety #MineWorkings #R7Method #FNR494 #TechnologicalSafety

Open in Telegram
Views4,430+138%vs avg
Forwards—
Reactions8
Comments—
#888Photo

🔥 Представляем одну из статей нового выпуска журнала «Горные науки и технологии» (№3, 2026)! Распространение ударной воздушной волны при взрывах – один из самых опасных факторов в подземных горных выработках. Для инженерной оценки её воздействия в России утверждены две методики – Р‑7 и ФНиП № 494, однако прямого сопоставления их точности на единой экспериментальной базе до сих пор не проводилось. Авторы статьи сравнили методики по потерям избыточного давления по длине выработок и на местных сопротивлениях (повороты, сопряжения, сужения и расширения), смоделировали реальный участок рудника в комплексе «Аэросеть» и сверили расчёты с натурными замерами при взрывании негабарита (96 кг аммонита 6ЖВ, датчик в 217 м от заряда). Результат показательный: методика Р‑7 предсказала давление 1,82 кПа при измеренных 1,945 кПа – отклонение всего 6,4 %. По критерию расстояния достижения измеренного давления отклонение Р‑7 составило 5,1 %, тогда как для ФНиП № 494 расчётное расстояние составило 46 м при фактических 217 м – расхождение по расстоянию достигло 78,8 %. Причина – в разных физических моделях затухания. Что это даёт для практики? Количественное обоснование выбора расчётного подхода для оценки опасных зон: на рассмотренных условиях Р‑7 даёт более близкое совпадение с натурными измерениями. При этом важно учитывать, что методики опираются на разные модели затухания и по-разному задают начальные условия. 📖 Подробности – в статье: Краев О.С., Князев Н.А., Кормщиков Д.С., Гришин Е.Л. Сравнительный анализ методик расчета распространения ударных воздушных волн в горной выработке. Горные науки и технологии. 2026;11(3):232–243. https://doi.org/10.17073/2500-0632-2025-12-1059 🔔 Подписывайтесь на Telegram-канал журнала: t.me/MinSciTech #нарусскомзыке #ГНиТ #УдарнаяВоздушнаяВолна #ВзрывныеРаботы #ПромышленнаяБезопасность #ГорныеВыработки #МетодикаР7 #ФНиП494 #ТехнологическаяБезопасность

Open in Telegram
Views443−76%vs avg
Forwards—
Reactions6
Comments—
#886Photo

❓ How to automate the design of power supply systems for mining enterprises? The design of power supply systems (PSS) for mining and processing facilities must meet specific requirements, including reliability, safety, cost efficiency, and flexibility. In practice, the process involves repeated manual data transfer between Excel, BIM models, and calculation software, which increases labor intensity and the risk of errors. Researchers have developed a digital software (DS) solution to automate this process. 🔹 How it was investigated: ✔️ Analyzed existing software packages and identified their limitations: fragmented design processes, the need for repeated manual data transfer, dependence on specific equipment manufacturers (Schneider, Siemens, ABB, etc.), the lack of an independent equipment selection module, and weak integration with BIM environments. ✔️ Formalized the methodology for calculating electrical loads according to the regulatory standard RTM 36.18.32.4-92 and implemented short-circuit current calculations with cable cross-section selection according to PUE tables. ✔️ Developed an algorithm and implemented a modular software solution in C#. ✔️ Ensured two-way integration with the BIM platform nanoCAD and the spreadsheet processor Excel. ✔️ Conducted practical testing on the power supply project of the Kumroch gold processing plant (GPP). 🔹 What was obtained: ✔️ Reduced the number of manual data transfer operations by up to 80%. ✔️ Data from the BIM model is imported into the calculation program automatically, without manual intervention. ✔️ The DS calculates electrical loads according to Form F636-92, short-circuit currents, and selects cable cross-sections according to PUE tables and the rated parameters of switching devices. ✔️ Output data is generated in Excel: electrical load calculations (Form F636-92), a cable schedule compliant with GOST 21.613-2014, cable and wire specifications, and a bill of materials and equipment list. ✔️ The software provides data for equipment selection, retaining full freedom of choice for designers and customers regarding the manufacturer. 🔹 Why this is important for mining: ✔️ The end-to-end automated design process minimizes the likelihood of human error and improves calculation accuracy. ✔️ The DS accounts for the specific requirements of electrical systems at mining enterprises, which are characterized by a need for reliability, safety, and flexibility. ✔️ The solution aligns with the digitalization strategy of the energy sector and is intended for implementation in design organizations. ✔️ Future development prospects involve the integration of artificial intelligence for real-time automatic project adjustments and the addition of calculation modules for alternative energy sources. 📖 Read more: Petrov V.L., Burmatova E.K., Pichuev A.V. Integration of digital technologies into the design process of power supply systems for mining enterprises. Mining Science and Technology (Russia). 2025;10(4):393–403. https://doi.org/10.17073/2500-0632-2025-09-461 🔔 Subscribe to the journal's Telegram channel: t.me/MinSciTech #InEnglish #MST #PowerEngineering #Automation #Digitalization #PowerSupplySystems #BIM #Design #MiningIndustry #CSharp #nanoCAD

Open in Telegram
Views6,560+252%vs avg
Forwards—
Reactions9
Comments—
#885Photo

❓ Как автоматизировать проектирование электроснабжения горных предприятий? Проектирование систем электроснабжения (СЭС) для горнодобывающих и перерабатывающих производств требует соблюдения особых требований: надёжности, безопасности, экономичности и гибкости. На практике процесс сопряжён с необходимостью многократного ручного переноса данных между Excel, BIM-моделями и расчётными программами, что повышает трудозатраты и риск ошибок. Исследователи разработали цифровое программное обеспечение (ЦПО) для автоматизации этого процесса. 🔹 Как это выяснили: ✔️ Проанализировали существующие программные комплексы и выявили их ограничения: фрагментированность процессов, необходимость многократного ручного переноса данных, зависимость от производителей оборудования (Schneider, SIEMENS, ABB и др.), отсутствие независимого модуля подбора оборудования, слабую адаптацию под BIM-среду. ✔️ Формализовали методику расчёта электрических нагрузок по нормативу РТМ 36.18.32.4-92 и реализовали расчёт токов короткого замыкания с подбором сечений кабелей по ПУЭ. ✔️ Разработали алгоритм и реализовали модульную программу на языке C#. ✔️ Обеспечили двустороннюю интеграцию с BIM-платформой nanoCAD и табличным процессором Excel. ✔️ Провели практическую апробацию на проекте электроснабжения золотоизвлекательной фабрики (ЗИФ) «Кумроч». 🔹 Что получили: ✔️ Сократили объём ручных операций при проектировании до 80 %. ✔️ Данные из BIM-модели передаются в расчётную программу автоматически, без ручного вмешательства. ✔️ ЦПО рассчитывает нагрузки по форме Ф636-92, токи короткого замыкания, подбирает сечения кабелей по ПУЭ и номиналы коммутационных аппаратов. ✔️ Выходные данные формируются в Excel: расчёт нагрузок по форме Ф636-92, кабельный журнал по ГОСТ 21.613-2014, потребность кабелей и проводов, перечень необходимого электротехнического оборудования. ✔️ Программа выдаёт данные для подбора оборудования, оставляя право выбора бренда проектировщику или заказчику. 🔹 Почему это важно для горного дела: ✔️ Сквозной автоматизированный процесс снижает вероятность ошибок из-за человеческого фактора и повышает точность расчётов. ✔️ ЦПО учитывает особенности электротехнических комплексов горных предприятий, для которых характерны особые требования по надёжности, безопасности и гибкости. ✔️ Решение соответствует стратегии цифровизации энергетики и предназначено для внедрения в проектных организациях. ✔️ Перспективы развития связаны с интеграцией ИИ для автоматической корректировки проектов в реальном времени и возможностью подключения расчётов для альтернативных источников энергии. 📖 Подробнее: Петров В.Л., Бурматова Е.К., Пичуев А.В. Интеграция цифровых технологий в процесс проектирования систем электроснабжения горнопромышленных предприятий. Горные науки и технологии. 2025;10(4):393–403. https://doi.org/10.17073/2500-0632-2025-09-461 🔔 Подписывайтесь на Telegram-канал журнала: t.me/MinSciTech #нарусскомзыке #ГНиТ #Энергетика #Автоматизация #Цифровизация #Электроснабжение #BIM #Проектирование #ГорнаяПромышленность #CSharp #nanoCAD

Open in Telegram
Views426−77%vs avg
Forwards—
Reactions9
Comments—
#880Photo

🔥 We present one of the articles from the new issue of the journal "Mining Science and Technology" (No. 3, 2026)! The main type of loss in X-ray luminescence separation of diamond-bearing kimberlites is weakly and anomalously luminescent diamonds: their spectral-kinetic characteristics do not correspond to the settings of the separators. To reduce these losses, luminophore-containing modifying agents are selectively fixed on the diamond surface, imparting the spectral characteristics of natural diamond to these diamonds. The authors studied how the temperature and pH of the aqueous phase affect the fixation of modifiers on diamonds and kimberlite, and selected regulating agents that reduce the adhesion energy of the organic collector on kimberlite minerals. What is the practical value? Heating the medium to 40 °C, acidifying it to pH = 5.5, and adding OEDP complexonate (200 mg/L) increase diamond recovery in separation by 15–17.5 % and reduce kimberlite yield into the concentrate by 0.15–0.45 %. 📖 Details – in the article: Chanturiya V.A., Morozov V.V., Chanturiya E.L., Samusev A.L., Dvoychenkova G.P. Increasing selectivity of X-ray luminescence separation through the selective fixation of luminophore-containing spectral-kinetic characteristic modifiers on diamonds. Mining Science and Technology (Russia). 2026;11(3):220–231. https://doi.org/10.17073/2500-0632-2026-06-1175 🔔 Subscribe to the journal's Telegram channel: t.me/MinSciTech #InEnglish #MSTRussia #Diamonds #Kimberlites #XRayLuminescenceSeparation #Luminophores #Beneficiation #MiningEngineering

Open in Telegram
Views1,770−5%vs avg
Forwards—
Reactions7
Comments—

All posts